Testing Checklist

Below is a checklist that should be completed before we leave to test NaviGator at a testing site. The following list helps to ensure that we have all necessary equipment at the testing site.

Warning

This list should always be followed (as we’ve learned time and time again).

Packing

Equipment

Radios
  • Radio Handset Box

  • Radio Base Station Box

Generators
  • Gas cans

  • Funnel

Boat and Trailers

Boat prep
  • Attach lidar

  • Attach camera covers

  • Stow wifi antenna, light post, rf antenna

  • Strap computer box closed

  • Stow batteries in main trailer

Boat trailer prep
  • Strap pontoons down on both sides

  • Check boat trailer lights

Main trailer prep
  • Check main trailer lights

  • Food
    • Water

    • Gatorade

    • Packaged snacks

Mechanical

Challenge elements

Electrical

Batteries
  • Spare battery set

  • Battery charger

  • Multimeter

  • Battery bolt wrench

Electrical Box

Software

Ubiquity

Network Box

Set Up

Equipment

Radios
  • Start charging handsets

  • Attach lanyards to handsets

  • Connect base station to power

Generators
  • Check fuel level

  • Powering up
    • Connect balance leads and check grounds

    • Start both generators

    • Connect to the trailer’s power lead

Boat and Trailers

Boat
  • Remove lidar and camera covers

  • Deploy wifi antenna, light post, rf antenna

  • Remove computer box strap

  • Attach batteries

Boat trailer
  • Unstrap pontoons on both sides

  • Disconnect boat trailer lights

Main trailer
  • Deploy trailer chocks

  • Set out cooler, chairs, pop-up, snacks, ice, drinks

Mechanical

Assemble and deploy challenge elements

Electrical

Batteries
  • Spare battery set

  • Battery charger

  • Multimeter

  • Battery bolt wrench

Software

Deploy the Ubiquity

Power and deploy the network box