SubjuGator Testing Procedures¶
Before leaving¶
For best results, packing should be done at least one day before a testing session. This
Packing list¶
Power Strip
Table
Extension Cord
Battery Box
Battery charger
Tether
Network Box
Ethernet Cables (2 + #of devs)
Laptops
7/16 wrench
5/32 Allen Key
Duct tape and scissor
Buoyancy foams for the sub
Pliers
Flat-head screwdriver
Kill wand
Multimeter
Goggles / Snorkeling Tube
Pool noddles
Dive fins
O’ring grease (Molykote 55)
Cable grease (Molykote 44)
Hot glue gun
Hot glue sticks
Large and small zip ties
clippers
Towel(s)
Tent (If going to Graham Pool or Florida Pool)
Chairs (If going to Graham Pool)
Software/Electrical Checklist¶
Update (
git pull
) and build (cm
) code.Verify all sensors output data.
Verify that the correct thrusters spin given the appropriate command.
Verify kill (soft and hard).
Grease all electrical connectors appropriately.
At testing site¶
Get wall power to powerstrip.
Setup and connect to Network Box.
Roll tether and connect it to network box. (DO NOT USE POE)
Connect Sub to to tether. (NOT POE)
Connect battery alarm, power on sub.
SSH into sub.
Start tmux, write code.
Grease O-rings with Molykote 55 every time a pressure vessel is closed.
ENSURE THAT THE RED PRESSURE RELIEF CAP ON THE BATTERY TUBE HAS BEEN SCREWED IN PLACE AFTER CHANGING BATTERIES
Person getting into the pool must do backflip.
Deploy sub. (check for bubbles, make sure buoyancy is correct).
Verify odometry.
Troubleshooting¶
:ref:
Troubleshooting The Nav Tube Connection<troubleshooting-nav>